Projects

Other Projects:

Millson Lake



Key Points of Interest

  • Prior prospecting in 2004/2005 led to the discovery of several uranium mineralized zones associated with at least 40 km strike length of moderate to strong conductivity attributed to graphitic pelitic gneisses unconformably overlying Archean granitic gneisses.
  • Prior drilling (DDH DD-08) returned up to 313 ppm uranium over 0.3m within a tectonized graphitic pelitic gneiss, which was encountered from 5 metres depth to 145 metres depth.
  • The Key Lake Shear Zone and associated EM conductors, host to several uranium mineralized zones discovered by Forum Uranium Corp. from 2005 to 2008, trends northeast through the property to the past-producing Key Lake deposits at the basin edge.

The Millson Lake Property is located approximately 60 kilometres from the southern edge of the Athabasca Basin in Northern Saskatchewan. The project consists of 6 mineral claims totaling 640 hectares, and is 100% owned by Fission 3.0 Corp. Millson Lake is located 60 kilometres south of the southeast edge of the Athabasca Basin, along the transition zone between the Wollaston domain and the Mudjatik domain, host to producing uranium deposits such as McArthur River and Cigar Lake. 

Qualified Person: The technical information in this website has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed by Ross McElroy, P.Geol., President and COO for Fission 3.0 Corp., a Qualified Person.

north_shore thompson_lake beaver_river perron_lake cree_bay manitou_falls pln pls clearwater_west hobo_lake costigan_lake millson_lake river_lake flowerdew_lake hearty_bay midas karpinka_lake